This project involved the complete redesign and replacement of the existing electrical, instrumentation, SCADA, control and security systems. Improvements include new 5kV switchgear, 4160V motor control centers, 208/120V low voltage transformers, lighting, SCADA system, security system and instrumentation. The electrical gear is housed inside a new climate controlled building which included a separate room for SCADA and Security System equipment. The design included electrical and control system upgrades for: