Cibolo Creek Sewershed Flow Diversion Project

San Antonio Water System

GEI designed the electrical, instrumentation and SCADA systems for two lift station facilities. Both of the facilities will have pumps with soft starters and a full backup generator system. Radio path studies were conducted for both sites by GEI.