Anderson Ground Storage Tank No. 1 Painting and Rehabilitation
San Antonio Water System
Grubb Engineering designed a new electrical and SCADA system for an existing 7.5MG tank. GEI’s design includes a 120V electrical distribution system, level electrode system, pressure transmitter and grounding.