Grubb Engineering designed new electrical and SCADA systems as part of the rehabilitation of a 1.5MG elevated storage tank. GEI’s design included a 240/120V electrical distribution system, SCADA system, lighting, grounding, security system and instrumentation. Lighting and electrical distribution system for an equipment vault is also included in the design. Grubb Engineering performed radio path surveys for the SCADA system.