GEI designed the electrical, instrumentation and control systems for twelve (12) sewer lift station facilities and the expansion of a wastewater treatment plant (WWTP). The design involved coordination for each facility with electric utility providers for service availability. Each lift station was individually designed per each site’s available space and flood plain conditions. Design for the WWTP included new switchboard, MCCs, control panels, and standby generator systems.